Projects :
National Iranian Oil Company - Naft Falat Ghareh (2006-2007)
Design ,fabrication and commissioning of one unit of 30
t/h water tube steam boiler as per the ASME Sec I. (joint
stock:Mashin Sazi Arak)
Atlasin Co. (2006)
Procurement and fabrication
of 22 units of Oxygen and Air pressure vessels as per the ASME
Sec IIV Div I
National Iranian Oil
Company - Iran Oil Terminals (2006)
Design, fabrication, installation and commissioning of 2 unit
of 60 cu M/h Deaeration system for Kharg Island water treatment
plant including all process, mechanical, instrumentation,
control system ,electrical and monitoring system.
Basparan Petrochemical Company (2005)
• Fabrication of 8 horizontal fitter vessels with the total
weight of 80000 kg.
• Fabrication of 6 vertical fitter vessels with the total weight
of 30000 kg.
These fitters use for filtering the inlet water going site
cooling towers. All these vessels fabricated as per ASME
CODE SEC III Div I.
Torbat Sugar Factory (2005)
• As the sub contractor of Nirou Pars Co.
Installation and renovation of 100 T/h, 60 T/h, 45 T/h, boilers
and installation of new burners and all steam , gas and oil
trains.
Mobin Petrochemical Company (2004 future contract)
• Supervision of 3 * 75 T/h superheat A-type steam boiler
installation
Alborz Bulk Pharmaceutical Company (2004)
• Design ,installation ,supervision and start up of 16T/h boiler
house
• Design ,installation ,supervision of full factory piping
• Reactors ,centrifuges and other equipments ,piping
(#1) Azar Ghand Naghadeh Sugar Factory (2003)
• Design and construction of 110 m3/h Boiler feed water
shell and tube Heat Exchanger
• Design and construction of power plant heavy oil preheat Heat
Exchanger
(#2) Azar Ghand Naghadeh Sugar Factory (2003)
• Design and fabrication of 11.3MW power plant piping
• Installation of 50T/h superheat steam Boiler equipments
,refractory and insulation
• Burnet installation for 15 T/h superheat steam Boiler
• Installation and supervision for 35T/h ,50T/h and 15T/h
equipments installation to start up
• 35T/h and 15T/h refractory and insulation fabrication
• 15T/h superheat steam Boiler internal drum piping